Henan Hebi Construction Bank

时间:2025/02/01

浏览次数:

The air-conditioned area of this project is 8,000 square meters. Our company won the bid with 8 air-cooled water chiller (heat pump) units - Series A. As a state-owned unit, China Construction Bank attaches great importance to aspects such as product quality, cost performance, and service.

案例推荐

Changzhou Risen Energy 102 Annual Output 5GW High-efficiency Battery and Module Project
For the Risen Energy (Changzhou) New Energy Project, Sujing provided terminal products such as combined air handling units and fan coil units. At present, the delivery and commissioning have been completed, and the units
2024-01-09
Henan Hebi Construction Bank
The air-conditioned area of this project is 8,000 square meters. Our company won the bid with 8 air-cooled water chiller (heat pump) units - Series A. As a state-owned unit, China Construction Bank attaches great importa
2025-02-01
Shanghai Suzhou-Hangzhou Supermarket
The air-conditioned area of this project is about 8,000 square meters. Considering the characteristics of large supermarkets, such as a large flow of people, a large space, and complex changes in the environmental layout,
2024-02-01
Anhui Qicai Group
In the competition among numerous brands, our company successfully won this project with its DBFX series water-cooled flooded screw chiller units.
2024-03-01
Harbin Citizen Building
For this project, the natural cooling units can effectively control the start and stop of single or multiple sets of axial flow fan components through the external environmental temperature sensed by the high and low vol
2024-02-01
Henan Yongcheng Han Palace Hotel
The air - conditioned area of this project is over 70,000 square meters.
2024-04-18