For this project, the natural cooling units can effectively control the start and stop of single or multiple sets of axial flow fan components through the external environmental temperature sensed by the high and low voltage switch components and the temperature-sensing probe components fixed on the finned heat exchanger components.
The indoor fan of the water-cooled precision air-conditioning unit adopts a sunken design of the EC fan, and the air supply mode of the unit is downward air supply, which enables a higher operating efficiency.
The indoor fan of the water-cooled precision air-conditioning unit adopts a sunken design of the EC fan, and the air supply mode of the unit is downward air supply, which enables a higher operating efficiency.
案例推荐
For the Risen Energy (Changzhou) New Energy Project, Sujing provided terminal products such as combined air handling units and fan coil units. At present, the delivery and commissioning have been completed, and the units
2024-01-09
The air-conditioned area of this project is 8,000 square meters. Our company won the bid with 8 air-cooled water chiller (heat pump) units - Series A. As a state-owned unit, China Construction Bank attaches great importa
2025-02-01
The air-conditioned area of this project is about 8,000 square meters. Considering the characteristics of large supermarkets, such as a large flow of people, a large space, and complex changes in the environmental layout,
2024-02-01
In the competition among numerous brands, our company successfully won this project with its DBFX series water-cooled flooded screw chiller units.
2024-03-01
For this project, the natural cooling units can effectively control the start and stop of single or multiple sets of axial flow fan components through the external environmental temperature sensed by the high and low vol
2024-02-01
The air - conditioned area of this project is over 70,000 square meters.